September 20, 2018
View from Living area

Overview

Floor plan

New master bathroom
– New window
– fixed glass
– new sliding glass door
– floor drain
– tile all walls

Revised Kitchen
– partial open shelves and upper cabinets
Revised Kitchen #2

Kitchen idea # 1

County Plot Plan

August 22, 2018
Proposed Floor Plan
Here’s a plan – trying to keep existing structure as much as possible – keeping cost down –

- New master
- New master bath
- New master courtyard
- Relocate front door to side – makes a better living area
Existing Floor Plan

Front View

Rear View

Overview of floor plan

Kitchen East

Kitchen North

